极品人妻videosss人妻-欧美日日日-一本加勒比hezyo黑人-精品国产乱码久久久久久郑州公司-海角社区在线视频播放观看-黑人巨茎大战欧美白妇-亚欧日韩-伊人手机视频-日韩精品亚洲精品-92精品视频-最色www

Share

Towngas Energy - Dongxin Paper Mill Distributed Energy Station Project

2023-02-06

Project Background

The power energy station is equipped with a 2MW gas internal combustion engine coupled with a flue gas/hot water-driven lithium bromide absorption chiller and other auxiliary equipment. All generated electricity is fed into the grid, while any shortfall in cooling capacity from the absorption chiller is supplemented by electric refrigeration units. The system achieves an annual comprehensive energy utilization rate of >85%.

Project Location:

Xinmi, Henan

Equipment Provided:

1*CG170-20/2000KW/10.5KV

Commissioning & Service:

Commissioned in late 2020 / Self-consumption with surplus electricity fed into the grid

Click the button on the right
Fill in product intention
Construction Machinery
400-881-8829
Engines/Generator Sets
400-821-3319
Lei Shing Hong Machinery Service APP
Lei Shing Hong Machinery Mini Program
Lei Shing Hong Machinery Service Platform Official Account
Lei Shing Hong Energy & Industrial Systems Official Account