极品人妻videosss人妻-欧美日日日-一本加勒比hezyo黑人-精品国产乱码久久久久久郑州公司-海角社区在线视频播放观看-黑人巨茎大战欧美白妇-亚欧日韩-伊人手机视频-日韩精品亚洲精品-92精品视频-最色www

Share

Qingdao Jiaodong International Airport Distributed Energy Station Project

2023-02-06

Project Background

The Qingdao Jiaodong International Airport Energy Station employs an integrated multi-energy supply solution comprising two 2,500KW gas internal combustion engines, flue gas/hot water-driven lithium bromide absorption units, a ground-source heat pump system, water thermal storage equipment, electric chiller units, flue gas hot water boilers, and municipal heating supply. The system operates in a grid-connected but non-export mode (i.e., connected to the grid without feeding power back). When the output from the flue gas-driven absorption units is insufficient, other equipment supplements the load. The overall comprehensive energy utilization efficiency of the entire energy station system reaches 84%.

Project Location:

Qingdao, Shandong

Equipment Provided:

2*G3520H/2500KW/10.5KV

Commissioning & Service:

Unit commissioning completed; grid-connected operation achieved in mid-2021

Click the button on the right
Fill in product intention
Construction Machinery
400-881-8829
Engines/Generator Sets
400-821-3319
Lei Shing Hong Machinery Service APP
Lei Shing Hong Machinery Mini Program
Lei Shing Hong Machinery Service Platform Official Account
Lei Shing Hong Energy & Industrial Systems Official Account